So, I took a screengrab from Google Earth and then overlaid on as best I could where everything currently envisaged goes. Hoping this is enough...
-----In 2004 we bought a falling-down house and 30 acres. This blog documents our progress-----
Friday, June 12, 2009
Updated site plan
Dad got a call from the local Planning department to say that they would like to have an updated site plan, which includes everything we plan to build in the "relatively near future".
So, I took a screengrab from Google Earth and then overlaid on as best I could where everything currently envisaged goes. Hoping this is enough...
So, I took a screengrab from Google Earth and then overlaid on as best I could where everything currently envisaged goes. Hoping this is enough...
Sunday, May 17, 2009
Bushfire Assessment Level details
After we learned about the new building regulations, Eric gave us some documentation about the key steps to assess where our property falls as regards bushfire risk.
We spent some time during our visit to go through it... Below is what we came up with based on our measurements:

As to what this means for our Risk level however, I haven't a clue. Cleverly, Eric didn't give us the section that tells you how to calculate it - as he didn't want that to sway our estimations! We'll just have to wait and hear back what he says... fingers crossed!
We spent some time during our visit to go through it... Below is what we came up with based on our measurements:
- Relevant FDI = 100
- Classified vegetation types: Woodland at rear of house (the state forest) is Group A forest , Low Open Forest 04
- Distance of site from classified Vegetation: 60m
- Effective Slope under classified Vegetation: Upslope
As to what this means for our Risk level however, I haven't a clue. Cleverly, Eric didn't give us the section that tells you how to calculate it - as he didn't want that to sway our estimations! We'll just have to wait and hear back what he says... fingers crossed!
Tuesday, May 05, 2009
Romantic Vineyard
While we were at Amherst in April, we stayed at the Romantic Vineyard. It was the perfect base - just 10 minutes walk.
We rented the cottage which had fabulous views over the vines, as well as wonderful open fire and small kitchen. Not that we used the kitchen often given Renee's fabulous cooking and Dave's amazing home-brewed beer... and that's before we got to the wine. :-)
Overall, highly recommended as a place to stay, we will be back!


This was the view we had every morning at sunrise, watching kangaroos hopping through the vines.
We rented the cottage which had fabulous views over the vines, as well as wonderful open fire and small kitchen. Not that we used the kitchen often given Renee's fabulous cooking and Dave's amazing home-brewed beer... and that's before we got to the wine. :-)
Overall, highly recommended as a place to stay, we will be back!
This was the view we had every morning at sunrise, watching kangaroos hopping through the vines.
Bay window
For our Christmas present a few years back, Dad got us a lovely bay window - most likely to go in the old house in the bedroom. I've only just got round to getting a photo - here it is:
Sunday, April 12, 2009
Work begins on the "boathouse"
Really it's just a glorified shed, but boathouse is a nicer name. :-)
Originally this was planned to be on the edge of the dam, but when we got there and saw how much of the central ridge was exposed, we decided to take the opportunity to build it in the middle of the dam instead.
Dad was the ringleader and did all the planning and calculations. Dave and Pete assisted at various stages, but this was basically Dad's project. He even sourced a lot of the materials from his stocks of scavenged wood, so with the exception of the pier supports, it will basically be all from recycled material.
By the end of the few days he had managed to get the base in and floors nailed down, and the frame and windows for the walls on one side. It wasn't quite as far as he'd hoped, but hey... I think it was an amazing effort all things considered.
Building it on the ridge made it a bit more complicated than it would have otherwise been - we needed to secure the stumps deep enough as if for a pier, and we eventually will need to have a ramp walkway. But it will be worth it in the end, just imagine being able to sit on the edge and look out over the water. :-)
Originally this was planned to be on the edge of the dam, but when we got there and saw how much of the central ridge was exposed, we decided to take the opportunity to build it in the middle of the dam instead.
Building the boatshed from Lynette on Vimeo.
Dad was the ringleader and did all the planning and calculations. Dave and Pete assisted at various stages, but this was basically Dad's project. He even sourced a lot of the materials from his stocks of scavenged wood, so with the exception of the pier supports, it will basically be all from recycled material.
By the end of the few days he had managed to get the base in and floors nailed down, and the frame and windows for the walls on one side. It wasn't quite as far as he'd hoped, but hey... I think it was an amazing effort all things considered.
Building it on the ridge made it a bit more complicated than it would have otherwise been - we needed to secure the stumps deep enough as if for a pier, and we eventually will need to have a ramp walkway. But it will be worth it in the end, just imagine being able to sit on the edge and look out over the water. :-)
Saturday, April 11, 2009
Stripping paint
While Dave was busy on the tractor, I spent most of my time during our visit stripping off paint from the old window and door frames at the front of the house.
The old paint was loose enough that with the help of scrapers and elbow grease we managed to get it all off without resorting to using a heat gun or chemicals.
Here's a few before and after photos:


I can't take credit for doing all of it though, I had huge help from Pete and Jen (my brother & sister), and also of course Dad who had arranged for the scaffolding to be set up...


The old paint was loose enough that with the help of scrapers and elbow grease we managed to get it all off without resorting to using a heat gun or chemicals.
Here's a few before and after photos:
I can't take credit for doing all of it though, I had huge help from Pete and Jen (my brother & sister), and also of course Dad who had arranged for the scaffolding to be set up...
Thursday, April 09, 2009
The big day arrives: installing the Ozzikleen tank
Woohoo! The Ozzikleen tank is in!
It arrived on my birthday, which I guess makes it a birthday present of sorts... :-)
Ozzikleen tank gets installed from Lynette on Vimeo.
It arrived on my birthday, which I guess makes it a birthday present of sorts... :-)
Wednesday, April 08, 2009
Dave digs a big hole
The big test for the tractor came when we needed to do a fairly major excavation, to fit the wastewater treatment tank.
It took Dave nearly 2 days, but he did it. :-)
... and for a taster of the full noisy experience, here's a short clip:
It took Dave nearly 2 days, but he did it. :-)
Dave digs a big hole from Lynette on Vimeo.
... and for a taster of the full noisy experience, here's a short clip: