Tuesday, November 22, 2011

Hedging our bets with the old house

So we were all set with the plans for the old house - it was to be a lovely little guest cottage, and a place to live in temporarily while the new house was built.  As the move looms closer though, we're being more practical and hedging our bets.

We'll need to be *very* sure before selling up in London and building the new house, since it'll be unlikely we could recoup that investment should we ever need to sell.  So, we've decided to make sure the old house is renovated in a way that, if worst came to worst, we'll be happy to stay living in long-term.

Which really just comes down to a question of space.  The way we had it planned was perfect for a holiday rental, but for permanent living there just wasn't enough storage and the kitchen was too cramped.  So we're tweaking one last time (hopefully).   It'll add a little on to renovation costs but Dad doesn't think too much - and certainly it will be a hell of a lot cheaper to make the changes now than later.

Here's the latest planned layout:

revised old house plan

For comparison, here's what it used to be:
latest layout plan for old house

There are 3 main differences between the old and new versions.  First, we stretched it - buying us space for a walk-in robe in the bedroom, as well as a more spacious dining area.  Second, we added an extra small "L" shaped bit to the kitchen area, again just to buy some more cupboard space and help the kitchen feel not quite so open-plan.   Third, the entry to the laundry is now enclosed to give a small back entrance area - a place for coats and muddy boots.  We've also made some minor tweaks - eg: changing the position of the bay window to have the symmetry of windows at either end; changing the direction the back steps go out, etc.

When I look at it, it feels pretty minor - but that extra space is going to make all the difference between feeling cramped and feeling comfortable.

We also gave some thought to how we might incorporate some of the scavenged materials - there are quite a few that, on initial glance, seem like they could fit.  Here's the ideas:

revised old house layout with coding coding for scavenged finds

Thursday, April 07, 2011

New photos from Google Earth!

I signed up a few months ago to get an alert whenever imagery in Google Earth was updated for our place. Lo and behold, today an email arrives. They've put on new satellite photos - this time from Oct 2009 when it was green!

It was quite fun to re-do the site plan map and see what a difference it made.  I especially like how in these new photos the dam is full and you can see the little dam shed as if it is floating. :-)

Amherst site plan - detailed

For comparison, this is what it used to look like, with the imagery from April 2007:
latest site plan

Tuesday, September 15, 2009

new rules in bushfire building regs

We got some great news on the bushfire zoning requirements from Eric recently... They introduced a lot of new rules after the horrible fires in 2009 which we thought might cause us problems. It turns out it will be a bit restrictive but nowhere as bad as we feared.

Here's Eric's notes:

According to the site diagram that you sent, the bushfire attack level would be 12.5 which is pretty easy to manage. I can itemize compliance issues with a table on the "general notes" page.

Most of the items can be covered with simple detailing. Several will require a bit more thought.

Cladding needs to be either:
- 6mm cement sheet, or
- a timber species listed in appendix E1 which includes Silvertop Ash that I often use.
http://www.radialtimbers.com.au/zproducts.htm

Windows that are less than 400mm from ground or deck level need to have toughened glass. Also they need to have either:
- bushfire shutters, or
- metal window/door frames, or
- timber frames made with wood from table E2.
You may need to check timber species from window suppliers, or else use the hybrid metal outside and timber inside windows.

Miglas does a nice window, and the timber species might comply. They don't do traditional double hung windows, though. http://www.miglas.com.au/top/home/

Decking needs to be either:
- non-combustable
- a timber species listed in appendix E1 which includes Silvertop Ash

In a nut shell, it all looks manageable to me without any drastic changes. You might need a few slightly more "modern" finishes than we've been thinking of, but not many.

Sunday, August 30, 2009

sketchup model of divider shelving

I spent some time today playing around with SketchUp again. This time, doing a mock-up of the divider shelving between the kitchen and lounge in the old house (see plan here) to make sure that it works.



This is meant to be indicative only - I haven't thought in detail about the precise layout of shelving - but it illustrates how it might work.

The unit in this mock-up is measured at 2.6m by 0.5m, which I think should fit? I'm guessing because of the height and weight of this, we will want to have a support beam somewhere, going to the roof perhaps. We can figure that out later...

Saturday, August 29, 2009

tweaking old house plans

Dad came up with the idea to move the bay window that was previously planned to go in the bedroom to the lounge, and build in a little window seat.

In order to see whether this would work, I needed to revisit the old house layout plans. The previous version was out-dated as we had moved the location of the kitchen doors so they lined up better between verandah posts.

The final architectural drawings for the old house are here. Using them, I played around with moving the window and overlaying furniture, and think I have come up with a layout that will work well:

latest layout plan for old house

We'll have to be careful how we position the window, to make sure it is nicely lined up between the verandah posts outside, while still leaving enough space for the divider wall. Also, we will need to plan carefully to get the window seat at a comfortable level without looking out of place relative to the existing front window. But in principle, they're different enough that I think it will work.

Another side-benefit to this is that it gives us more flexibility in the layout of the bedroom. By not putting in the bay window and just leaving it as solid wall (as it is currently), we would save ourselves a job as well as gain more space for furniture.

Saturday, July 25, 2009

Dad's plans for work with Dave

Dad is getting organised for the work that he and Dave will do in August. Here are his plans:


I want to build the veranda portion that is the same as the north face of the house, leaving off the mitred end that returns on the east face for now as I have scaffold there for painting. I am building baseboard doors to open for access and close and lock for security along this north face portion of the veranda. There will be 8 bays for storage and two shelves permitting material of short and long length. I will be doing this work when Dave is on-site, and hopefully store the lining boards away, sorted into the various types.

I do not wish to put on the veranda posts yet as I plan to use the old iron to cover this area while work goes on elsewhere over the long-term. The posts will be in the way for now. I will use the 3m lengths of roofing from the Toora house for my temporary storage.

I want to spend some time finding a source for the flooring. It will be a large cost item, and many options present. That will be discussed later.

I also want to leave the steps from the north face for later discussion as I believe they merit a proper detailed consideration and construction in keeping with the rest of the veranda. Alan has figured a simple open plank structure which is really not sufficient unless you are happy with this design. I do not want to sacrifice one or two bays of storage area to build the steps now rather than at the end of the project.

I have aimed at having sufficient work for Dave and I, without being overly stocked with materials that must be stored safely. Later, I will address the repairs of the east face weatherboards and windows and door entrance as my next project, and completing the painting. But doing the north face now as well as giving storage area will give access to place the window and doors along this face at a comfortable level.

The tractor will have the posthole attachment on it while Dave is there so if you have holes that need to be made for trees we will put these in and place topsoil into the holes.

I hope Dave will have time to do some tractor work excavating the house site and establishing the spoil fill-in of the sewage effluence field while he is here. However, that will not be a priority. Doing holes for trees will be, but only if you have considered well where these are to be placed.

Monday, July 20, 2009

mistakes in old house plans, arrgghh

After all the euphoria over the building permit being granted for the old house, Dad has now discovered there are some mistakes with the plans.

He had got a 'friend' of his to do the drafting work on them which was far cheaper than going through an architect like Eric... but wow, talk about a hassle. I would not ever use that draftsman again. Not only did he take far too long (months and months of promising and never delivering), it now turns out that there were mistakes!!

Fortunately Dad spotted them before we proceeded too far, and the guys at the Shire have said it is fine to alter, phew. But still... one hassle Dad didn't need.

Here's Dad's update on the problems:

Alan states the veranda posts are 125x125 cypress pine. I plainly told him they were to be 100x100 cypress pine but he forgot to alter this. I have called the shire to enquire if I can alter this detail.

Alan also states selected treated pine baseboards around the outside of the veranda. I may wish to use hardwood due to the longer lasting nature of hardwood due to being more stable in the sun in larger sections. Treated pine tends to curl a lot and look awful after a few years. I will ask the surveyor if I can change this also.

Alan also states the 1 metre high column encasing the three posts is to be made of weatherboards, but I believe it will look better with lining boards. Same material, but no need for total weather tightness on these and a very much superior finished look. I will also ask the surveyor if I can use the lining boards.

Alan also was not told or forgot that this will be a lined veranda with the ceiling level forming an air space with the roof. I see he has mentioned use of 100x50 HW F8 for the rafters of the utility, where it is more usual to use 100x 38 HW F8. I will ask the surveyor if I can alter this. The use of heavier than required framing members above the ground is pointless and bad building. I plan to use 100x38 HW F8 for the ceiling joists that the lining boards attach to as well.

As there is a large quantity of material involved I need to sort out this anomaly earliest possible before running afoul the inspector after much expense.

Tuesday, June 16, 2009

Yay! Building permit is granted

We got a letter from the Central Goldfields Shire Council today, which gave us the great news that the building permit for the renovations to the old house has been granted.

BS-19314/20090076/0 is our number. :-)

I didn't scan it as most of it is just details about the property location and other details we included in the permit application.

The only really important thing is the date: Building work must commence by 16th June 2010 (not a problem as Dad and Dave will start in August), and be completed by 16th June 2011. That latter date will be a stretch given we are still stuck in the UK... but perhaps something miraculous will happen. Worst case we extend it for a year and Dave takes a semester off work here to go back and work on it.

Friday, June 12, 2009

Updated site plan

Dad got a call from the local Planning department to say that they would like to have an updated site plan, which includes everything we plan to build in the "relatively near future".

So, I took a screengrab from Google Earth and then overlaid on as best I could where everything currently envisaged goes. Hoping this is enough...

latest site plan

Sunday, May 17, 2009

Bushfire Assessment Level details

After we learned about the new building regulations, Eric gave us some documentation about the key steps to assess where our property falls as regards bushfire risk.

We spent some time during our visit to go through it... Below is what we came up with based on our measurements:
  • Relevant FDI = 100
  • Classified vegetation types: Woodland at rear of house (the state forest) is Group A forest , Low Open Forest 04
  • Distance of site from classified Vegetation: 60m
  • Effective Slope under classified Vegetation: Upslope
The map below is not to scale but shows measurement of where the ridgeline (change from upslope to downslope) occurs in the woodland, position of house, fences etc.

firemap

As to what this means for our Risk level however, I haven't a clue. Cleverly, Eric didn't give us the section that tells you how to calculate it - as he didn't want that to sway our estimations! We'll just have to wait and hear back what he says... fingers crossed!

Wednesday, March 11, 2009

Update from Dad on council contact

Dad reports the people in the council planning department were very nice and helpful. It's not often you hear that, so I think we have really lucked out. :-)

He also talks about plans for possible house re-stumping, fingers crossed it won't be too bad.

Email update from Dad - 11th March

I have spoken by phone this morning with Tom at the council. He was exceptionally helpful, knows Malcolm, and will contact Malcolm himself to discuss matters. He has arranged to photocopy all documentation required to expedite this application.

I told him about the long delay incurred by Septech not following through with things, and with the Christmas break, and my subsequently having very little time to get this permit in place before we intend to install it this April. He was very understanding and said the building permit for the old house is ready to go pending this permit being successfully arranged. I feel that it is going to fall into place.

I said that we have purchased a piece of equipment for landscaping and digging requirements and it was urgent that we be able to install this tank when Dave is on hand to operate it and get instruction from Malcolm concerning the functioning and design of the system in it's entirety. I told him that Malcolm will attend to providing the necessary description of the system, and that as it is a bog standard waste processing system that is quite often used in the area there really will not be a difficulty in this regard.

I can do no more. We are greatly in Tom's debt on this account and when you have the chance to shout him a beer you should do so Dave. He could not have been less a bureaucrat in an office as I have so often encountered. So we are now pretty certain of having things in place in time and can breath a sigh of relief. By the way, we are also deeply in Malcolm's debt for being willing to step into the gap on this one. I realize it is business, but nevertheless we are favoured by his prompt attention to matters.

Underhouse work must follow reblocking work required, and as yet that aspect has not been investigated. Richard, the surveyor for the old house, has told me that most likely all the perimeter stumps will need to be replaced. I have to dig down and expose the collar rot if any to see how bad they are. Most stumps will rot at the point just below the surface of the ground where there is enough oxygen for fungus to function and enough moisture to keep them happy. I will take time to expose these when I am there this working bee. I also must put concrete stumps under the area of the bathroom where it will become effectivey two stories. I will not worry to do stumps that will be accessible for the augre on the tractor until we have that piece of equipment. In any case such work would hinder the underhouse work. I am putting my money on the stumps all being in good order. but if there is the slightest doubt about the perimeter stumps they need to be sorted out first.

This house will be insulated beneath the floor so pipes, wires, etc may be inaccessible. Unless these are all to be put on the surface. I will have to follow through later about these details. I had no time to see an electrician when there with Dave doing the olive enclosure, but may get one out when we are on the premises this time. With you there this would be a great opportunity.

Saturday, March 07, 2009

New planning rules due to Bushfires

The recent bushfires were terrible (massive understatement). Luckily Amherst wasn't affected but it will be now indirectly, because they are bringing in new planning laws.

The new rules were published by the Building Commission yesterday, you can see them here. It's apparently one of the fastest introductions of new regulation ever.

Hopefully it shouldn't affect us too much for the existing house, as that is a renovation rather than a new build. But it will have implications for the new house depending on what "risk level" they class our property as being in.

I am praying that, because we're not right up against the forest - in that there is a big patch of open space with no trees between the house and it - we won't be at the highest level.

But, I would like to find out ASAP because it has a big impact on the materials we're allowed to use in building the new house. So if, for instance we won't be allowed to use wood shingles as cladding (like we had been toying with at one stage), but instead will have to make it from some form of brick, I would like to know now so I can adjust my daydreams....

Tuesday, February 10, 2009

Engineering plans are done - woohoo!

After the planning permit for the new house was approved in September, we decided to bite the bullet and get the Structural Engineering Plans drawn up.

We had originally planned to use someone local in Maryborough, but they seemed reluctant to take on any new work. So, after several failed attempts at getting them to engage, we gave up and found someone in Melbourne instead.

The firm who helped us out were recommended by Eric, our architect, and they turned out to be great. Not only did they get the work done pretty much on deadline, compared to other quotes we had they were very reasonable too. So, if you're looking for a structural engineer in Victoria, I recommend them: John Gardner & Associates.

You can see the plans below. (I warn you it is *scintillating* reading - NOT).

PART 1: S1 to S6

8093 - S1 to S6

PART 2: S7 to S12

8093 - S7 to S12

And if that wasn't enough... there is PART 3: 73 whole pages full of computations.

Thursday, September 25, 2008

Planning permit is approved, yay!

We had a slight panic a few months back when it appeared they'd re-zoned our property from Rural Zone to Rural Farming Zone, which meant that ordinarily we'd only be allowed to have the one house on the property. We decided therefore to get clarification as soon as possible before investing more time in doing up the old house, by applying for a planning permit.

And the great news is, they've granted it!! So we can go ahead with everything as planned. Yay!!!

There are some constraints but nothing that seems out of the ordinary or unexpected. You can see the full details here.

Below are Dad's initial thoughts and updates from September 24th:

I think the development commencement can be considered with the Septech system, watertank for the fire service, and renovations of the old house. However they may consider the work on the new house must be commenced within two years. If so perhaps I could ask if site preparation, eg the required cutting before foundations are established, would be acceptable as a commencement of the new structure. An extension of completion time is probably relatively easy. There is a risk that if an adequate commencement is not achieved it will lapse and the planning permit come up for consideration again. I think we ought to proceed with getting a permit for the new structure before commencing any other work on it, especially the site preparation, even though you do not wish to proceed with it until closer to your return. I am waiting to hear from the plumber, and will call him soon. I took the work of drawing to Allan Davies. He has only to tweak the original drawings and print some copies. Should not be very costly, and he promised completion by the end of this week.

Sunday, July 27, 2008

revised electrical plan

In response to Mum's comments, Dave revised the electrical plan slightly, basically just adding a few powerpoints. You can see the revised version here, but we'll probably tweak it again when we get closer to installing and know eg: precisely the kitchen layout:

(Click photo to view bigger):
revised electrical plan

Here's Mum's suggestions in full from her emails on July 22:

I think you could do with a light over kitchen bench underneath the overhead cupboards – light overhead is behind you and will cast shadows otherwise. Or use spotlights to shine in on angle I guess.

Make all powerpoints double and I think you could do with more – kitchen needs more, over bench – blenders, mixers, toaster oven, whatever. You may not use them often as you don’t cook like I do BUT when you need them you will kick yourself if they are not there. Also, I think more are needed almost everywhere – a heater, a fan, whatever might well be needed all over. Allow for computers to plug in, TV in bedroom and so on – and don’t forget TV antenna points and consider smart wiring, radio network the palce – you may as well, it probably won’t cost much extra to do it from scratch but will be a lot more to add it later.

I am not sure about dimmers – they are out of fashion, hard to get, and we are soon to go all energy saver lights which cannot be fitted to dimmers at this stqge. Later this year they get phased out, the conventional sort – and from late next year the normal sort cannot be sold. Already there are more inds and sizes of the energy sver sort on sale – I can put them in most places round my place now and they come in different sizes and bayonet or screw in now too.

Don’t forget where you need the vacuum cleaner to plug in, either. Is one power point outside enough? I’d be thinking at least a double one on each veranda, ie one beside of house if not two per side. Car cleaning with vacuum, maybe a pump, external lights, whatever.



My reply 22nd July:

Hi, thanks a lot for looking at it and for the comments.

Yes, I thought about the kitchen bench lighting but we aren't sure where the cupboards will be. But I should make a note of it for Dad anyway.

Good idea too about the heaters etc, maybe I will just scatter a few more powerpoints around generally. All would be double powerpoints as a matter of course (I didn't realise they came in anything other than double anymore!) But for things like computer area we will have a separate extension board that plugs into a single socket and then has space like for 6 things to plug in. The boards have a circuit breaker to protect in case of power spikes: we use them here and it's just good practice as have heard of people whose equipment has been destroyed by it otherwise.

We'll just be using WiFi to beam things around which is wireless - so shouldn't need anything special done wiring wise: keeping it wireless makes it a lot easier to upgrade.

TV antenna points? I didn't even think of them - I'm so used to just having a satellite dish. But yes will make a note of it in next iteration. The TV location is marked and we can use our Slingbox and the WiFi to beam the signal around the house to any laptop, so as long as it works to the TV in the lounge that's the only point it would need.

Dimmers are a non-negotiable requirement - we've learned from our house here that they make a huge difference to the mood of a room. They are still very fashionable here, even more so nowadays when people want to save energy as when you dim you reduce the power used. Maybe we should buy a bulk load of dimmer switches here to bring back? Starting last year in UK, you can get longlife bulbs that dim. They're not perfect yet (sometimes take a little while to flick on) but they work.

Monday, July 21, 2008

electrical plan for cottage

Dad was adamant that we do a first pass of the Electrical plan for the cottage so that he can start getting quotes from electricians.

Here's my attempts: a plan for location of powerpoints, and a separate one for built-in lighting and switches. (Click to view bigger):

Location of powerpoints

Lighting plan


Dad's email 21 July:

In order to get an idea of cost for the whole project I must get a quote from an electrician for the wiring, a quote from the plumber for the plumbing, etc. I am often not on the premises for any length of time so this seems a natural time to book an appointment for a few tradies to visit ... I need to start gathering some momentum to get done those things which involve persons other than myself... Of course I will do outdoor things first, but I will be hoping to get the wiring done and then I can use it from the generator and work anywhere in the house safely. I want only a basic for this week of where you definitely need things, then I want you and Dave to discuss at leisure these things, and if Dave has the chance to walk about and place texta marks on studs in vital places while here I feel it will be well worthwhile. But having the plans there will give you some idea to put marks on it in pencil, and Dave can make notes while here of anything you need to discuss more later. Of course the kitchen is one such. I only need to know approx how many power points and where so wire, switches, fittings for power, etc can be estimated by an electrician. We can start with batten holder fittings for light, and refine later with other special lights for you. Things done after plaster goes up are possible but not so easy so become more costly.

Monday, June 23, 2008

Soil test results

Yes, they have finally arrived. Here's the key extracts:

soil test results summary

(Click to make it big enough to read).

Also, here's the background information leaflet.

Sunday, June 01, 2008

so it'll be a grey roof then

The only slight concern that we had with the last set of plans from Eric was that there are now 2 solar panels prominently displayed on the roof.

I was a little worried they might be an eyesore, so asked what flexibility there was to move and/or disguise.

Here's Eric's response:

For solar panels to work properly in this situations a few few criteria need to be addressed:
- North facing, minimal shading
- Nearby, and below the hot water tank (which is also positioned to suit the wood cooker)
- The pipe from the tank to the panel needs to go down continuously with no dips or uphill section.

I think that this is a good position for the system to work. Another option is on the east verandah roof, but it will be shaded by early afternoon. It can even go at ground level, but there is always a chance that the panels will be broken. One option to hide the panels is to have a grey roof which I often do.



So, it'll be a grey roof then. :-)

Thursday, May 29, 2008

detailed plans for new house (almost)

Today the almost-finished house plans arrived from Eric. I say almost, as there's still a chance they might need tweaking depending on the structural engineers report. (Which as yet we've not commissioned, as holding off to hear about the planning permit and also to get some alternative quotes).

These plans are designed to be of sufficient detail to be suitable for applying for a building permit. As much as he could, Eric has kept descriptions generic, to allow us flexibility in deciding on the precise brand / style of finish.

The best thing about this set of the plans is that it's got detailed measurements, so we can at last seriously cracking on working out things like the design of the kitchen.

I've uploaded a couple of the pages to Flickr as below, but if you're curious, the full set of plans (all 17 pages worth) is here.

Ground floor - main house:
2nd floor floorplan

Second floor - main house:
1st floor floorplan


Library wing:
library wing floorplan

At last! a name

We started thinking about what to call the house(s) over three years ago and have at last come up with something we both like.

Until recently we were leaning towards "Cricklewood Farm" - in homage to where we live in London. But it never felt quite right, not to mention would be forever subject to japes about The Goodies (who I just discovered even wrote a song about it).

So, on our recent driving trip in Kent and Sussex we brainstormed other names and came up with the idea of "Ridgeview". It seemed apt as we're on a ridge and we have a view... but of course when we came to look for URL's it - and numerous variants, Ridgeviewhouse and so forth - were already taken.

Then we had a brainwave and came up with an alternative that I liked every more:

Ridgefields

... and miracle of miracles, www.ridgefieldshouse.com was available!!

(We might get the .com.au version too if I can ever get my head round the trademark registration process).

Who knows, we might end up changing it if we come up with something better in the next few years, but right now I'm just so happy we have something to fall back on that we both like. :-)