Dad has been making progress at Amherst, see updates below. Thank goodness we have his help, it would be impossible otherwise.

September 17th:

Hi, I have just returned from a day to Amherst to meet with the building inspector dealing with the application for a permit. I met with him for about one hour, but had to get there and back the same day. I took a large load up of wrought iron balustrading, pinepoles for the gazebo, and wrought iron posts to use as needed, or to access material for completing other tasks. I got another load of wood to finish my winter. I will work tomorrow on the stumps and stirrups of my back veranda. I had two days together to do work here, but the inspector could only fit in with Mon, Weds, or Friday, so I took time to meet with him. I have to do some additional drawing of details of the Juliet balcony over the bathroom of the old house. The present plan shows that posts to the ground and footing is the support mechanism, but I made it clear to the draftsman that cantilever beams would support this. I will draw an addenda detail asap and send to you and the council. I am too tired now to tell you all he wants, but will send an email tomorrow morning with greater detail.


September 6th:

I returned home from Amherst at 7pm, to a small party for my Father's day. Pete brought his new girlfriend, and Jenny had been there visiting with Vida since 6pm. I had a great conference with the plumber, who used to come as small lad to your paddock to hunt rabbits when it was Fisher's Poultry farm. I will hear back from him soon as to the cost of a 3000 litre septic with effluence drainage fields. He feels it will be best to proceed directly with Septech though because of the cost, probably near $5000 depending on what specifications John Kelly the health officer requires for the length of the effluence field. But he is going to be the plumber of choice I think for the rest of the old house plumbing. I will explain later in greater detail. I am off to church now so must hurry for now.


September 1st:

I will tell you now of my plan to continue to build the hobbithole, but instead to make it an actual chicken house in the short-term. I like chickens, and it will do it no harm in the course of the construction of the house over a long time for it to be used primarily as a chicken house. So I will continue to dream and use bits and pieces that come to hand to create the dream. Dave said when we spoke of it that this was alright, and after consideration I think it proper to proceed when I feel like it after my work here in Ringwood is completed.


August 29th:

I have completed the roof of the shed except for some ridge capping and spouting and drainage. There has not been anymore rain so transfer is not needed to the upper tanks. I still need to contact the plumber and electrician. I will place the drip system into action for the citrus trees in the orchard when things start to dry. There has been showering rain there it seems.